Project Summary

Scope of work:    

Emergency repairs to the promenade and rock armour to protect existing defences at Avon Beach. Rebuilding of groynes at Friars Cliff Beach.

Contract included:    

  • Repairs to the seawall
  • Fill voids to promenade with reinforced concrete
  • Fix the concrete canvas to the failed sheet piles
  • Supply & place 1,500 tonnes of locally sourced rock armour to protect seawall/concrete terracing and rebuild 3 no. groynes
  • Demolition and disposal of 50 storm damaged timber beach huts
  • Clear debris from the beach and re-profile sand/shingle
  • Survey promenade to identify potential undiscovered voids

Client: Christchurch Borough Council

Location: Christchurch

Contract Value: £200k

Project Gallery

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top