Project Summary

Scope of work:    

Reconstruction of existing crane rail and replacement of drainage.

Contract included:    

  • Removal of 501m of existing bar drainage and replacement with new cast insitu slot drainage
  • Supply and installation of a new class 1 bypass interceptor with new penstocks and quay outfall
  • Removal of 375m of existing crane rail and existing timbers/fixings.
  • Construct a new concrete foundation and refix the existing rail with new sole plates and fixings, and reinstate rubber crumb surfacing
  • Working within a live container terminal. Working closely with port operations to accommodate ship movements

Client: DP World

Location: Southampton

Project Duration: 4 Months

Contract Value: £700k

Project Gallery

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top