RNLI Slipway, Selsey

Project Details

Construction of a sheet piled and reinforced launch ramp for the RNLI at Selsey, acting as a sub-contractor to Reside Construction, main contractors for the new lifeboat station.

The contract includes:

  • Excavation and reinstatement of existing beach to facilitate the works
  • 110m2 of interlocking steel sheet piles
  • Reinforced concrete pile cladding and capping beam
  • Concrete slipway for launch and recovery of new class lifeboats
  • Alterations to existing sea wall flood defences
  • Construction of access ramp and stairs to beach
  • Reconstruction of reinforced concrete beach promenade