Extensive groundworks to boat building facility, Poole.
The contract included:
- Earthworks and site preparation
- Cast insitu reinforced concrete foundations
- Reinforced concrete ground floor & upper floor slabs
- Installation of holding down bolts for columns up to 1m x 0.5m sections
- 7000m² heavy duty block paving
- External works
- Hard landscaping
- Intricate shaped curved casted insitu walls
- 10,000 cubic m² sand moved to raise level
- Installation of drainage including interceptor tank approx. 5m deep
- Excavation in tidal zone