RNLI, Poole

Project Details

Extensive groundworks to boat building facility, Poole.

The contract included:

  • Earthworks and site preparation
  • Cast insitu reinforced concrete foundations
  • Reinforced concrete ground floor & upper floor slabs
  • Installation of holding down bolts for columns up to 1m x 0.5m sections
  • 7000m² heavy duty block paving
  • External works
  • Hard landscaping
  • Intricate shaped curved casted insitu walls
  • 10,000 cubic m² sand moved to raise level
  • Installation of drainage including interceptor tank approx. 5m deep
  • Excavation in tidal zone