Mudeford Sandbank Beach Recylcing and Coast Protection Asset Repairs

Project Details

To access the EBB-Tide Delta, 100m off Mudeford Spit and excavation of approximately 7000m³ of existing material.

The contract included:

  • Transport via Volvo articulated dump trucks, to previously identified depleted groyne bays and spread as required
  • Clear blown sand from existing promenade along spine of Mudeford Spit and place back into depleted bays
  • Import and place 320t of additional rock armour to strengthen and heighten the seaward facing revetment
  • Replace and repair existing groyne markers