Lymington Breakwater

Project Details

Construction of new western breakwater and top up existing structure on eastern side of harbour entrance.

The contract included:

  • Tidal works from afloat
  • Unload rock barge
  • Transport & place 18,000 tonne rock armour in 300kg to 1000kg units

Site Plant:

  • 20t Tracked Dumper
  • 50t Excavator with rock grab
  • 30t Excavator with rock grab