King George V Docks, Southampton Docks

Project Details

Phase (1) 35 week contract over a 11 acre site in Southampton Docks.

The contract includes:

  • Excavation and recycling of sub-base materials
  • 30,000m2 in situ 300mm deep reinforced concrete slabs
  • Rising main and pumping station
  • Bulk walls of PC planks and driven steel piles
  • Interceptor tank – temporary works including sheet piling and construction of 5m deep GRP tank
  • Sewer diversion
  • Kerbing
  • Security fencing and high tech vehicle access gates
  • RC foundations and lighting towers
  • Associated works