Emergency Works at Highcliffe and Gundimore Beaches

Project Details

Emergency works and repairs at Highcliffe and Gundimore beaches.

The contract included:

  • Reinstate leisure track
  • Reposition rock armour and adjust beach levels at Gundimore beach
  • Trim and tidy all edging of the vehicular access track at Highcliffe beach
  • Supply and place 100 tonnes of rock armour as scour protection.
  • Installation of a geomembrane to prevent wash out of fines
  • Beach recycling to reinstate levels to suit all access tracks