SCT3-4 Drainage and Crane Rail Works, Southampton Docks

Project Details

The contract included:

  • Removal of 501m of existing bar drainage and replace with new cast slot drainage
  • Supply and installation of new Class 1 bypass interceptor with new penstocks and quay outfall
  • Removal of 375m of existing crane rail and existing timbers/fixings. Construct new concrete foundations and re fix existing rail with new sole plates and new fixings and reinstate with rubber crumb surfacing
  • Working within a live container terminal
  • Working in close liaison with Port Operations to accommodate ship movements