Christchurch Beach Recycling

Project Details

The contract included:

  • Dredge & divert main navigational channel at river mouth
  • Construct geobag sand / shingle barrier to defect river flow
  • Recover material from offshore sandbank utilising hydraulic cutter-suction equipment and floating pipelines to discharge material ashore
  • Load, transport & spread approx. 25,000m³ sand / shingle to various beaches on Mudeford frontage
  • Additional rock armour to reinforce existing groynes
  • All operations carried out in an environmentally sensitive area and programmed accordingly