Project Summary

Scope of work:

Design and construction of a galvanised steel 115m long structure, to serve 76 straddle carrier bays, four storeys high with access stairways, wheel stops & wheel guides.
Walkway and access lighting, warning lights, installation of security turnstiles, CCTV and lightening protection. Reconstruction of 4,500 m2 of 300 mm thick pavement quality concrete together with associated slot drainage, water main works and ISPS security fencing.

Plant included: mobile crane, Komatsu HB365 hybrid, Hitachi ZX170W, Volvo A25 dump truck, Telehandlers & MEWP’s.

Client: DP World

Location: Southampton

Project Duration: 20 Weeks

Contract Value: £2.5m

Project Gallery

Share this information

Other Projects

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top