Project Summary
Scope of work:
Sheet piling and associated works at Eling Wharf, Southampton. Excavation and removal of existing timber retaining walls. Supply and drive AZ 28 sheet piles, length 12m. Supply and install 600mm diameter 10m length steel tubular piles, tie rods and waling as an anchorage system.
Our plant included:
– Doosan DX380 excavator fitted with our Movax SG-75V
– Komatsu HB365 hybrid excavator
– Komatsu PC210 excavator
– 40t telescopic crawler crane
– Safety boat
Client: ABP
Location: Eling, Nr. Southampton
Project Duration: 9 Weeks
Contract Value: £850k