Project Summary

Scope of work:    

Revetment to protect residential development on the south side of Southampton Water. Tidal operations with restricted access and working area. Close liaison with Client and local residents. Removal of existing failed rock revetment, reprofile slope, re-use of materials, excavation and construction of rock toe and drainage. Supply, transfer from ship to barge, delivery and placement of 14,000t of rock armour from Norway to construct 400 linear metres of slope protection. Rock size 0.3-1t to form new revetment on geotextile membrane.

Client: Taylor Wimpey (Southern Counties) Ltd

Location: Hythe

Project Duration: 26 Weeks

Contract Value: £3.2m

Project Gallery

Share this information

Other Projects

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top