Project Summary

Scope of work:    

Working as Principal Contractor to provide new wind turbine blade preparation and storage facility at the former Fawley power station site. Demolition of existing access roads. Formation and construction of new access roads and storage areas.

Alteration of existing facility assets. Construction of new insulated building foundations with power float finish. Installation of new gas, water and communications services.

Construction of new fuel facility, complete with Class 1 bypass separator and assorted drainage.

Installation of new foul and storm water drainage. Construction of new crane rail slab to take turbine blade dollies.

Client: Fawley Waterside/MHI Vestas Offshore Wind Blades UK Ltd

Location: Fawley

Project Duration: 26 Weeks

Contract Value: £2.7m

Project Gallery

Share this information

Other Projects

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top