Project Summary

Scope of work:    

Dredge and divert the main navigational channel at Mudeford river mouth. Construct a geobag sand/shingle barrier to deflect river flow. Recover material from offshore sandbank utilising hydraulic cutter-suction equipment and floating pipelines to discharge material ashore. Load, transport and spread approx.

25,000m³ of sand/shingle to various beaches on Mudeford frontage. Additional rock armour to reinforce existing groynes. All operations are carried out in an environmentally sensitive area and programmed accordingly.

Client: Christchurch & East Dorset Council

Location: Christchurch

Project Duration: 6 Weeks

Contract Value: £620k

Project Gallery

Video

Share this information

Other Projects

Earlcoate Construction, Civil Engineering & Coastal Defence Contractors
Address & Contact

Earlcoate Construction and Plant Hire Ltd
Folds Farm
Godshillwood
Fordingbridge
Hampshire
SP6 2LU

Tel: 01425 657767

Useful Links
Connect with us
Full-width Footer Logos, Centred Wrap
Back To Top